用户:Sinsyuan/英维GA翻译工作室/台湾高铁
台湾高铁 | |
---|---|
Taiwan High Speed Rail | |
![]() | |
概要 | |
所有者 | 台湾高速铁路股份有限公司[a] |
服务区域 | 台湾西部 |
交通类型 | 高速铁路 |
线路 | 1 |
起点 | 南港 |
终点 | 左营 |
车站 | 12 |
年客流量 | 81,882,961(2023年)▲ 61.8% |
网站 | www |
运营 | |
开始运营 | 2007年1月5日 |
运营单位 | 台湾高速铁路股份有限公司 |
线路类型 | 高架、地下、平面 |
技术 | |
系统长度 | 350千米(220英里) |
线路总数 | 2 |
轨距 | 1,435毫米(4英尺8+1⁄2英寸) |
动力方式 | 高架电车线(25千伏特交流电) |
最高速度 | 300千米每小时(190英里每小时) |
台湾高速铁路 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Taiwan High Speed Rail Corporation | |||||||||||||
繁体字 | 台灣高速鐵路 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
简化字 | 台湾高速铁路 | ||||||||||||
| |||||||||||||
Taiwan High Speed Rail | |||||||||||||
繁体字 | 台灣高鐵 | ||||||||||||
简化字 | 台湾高铁 | ||||||||||||
|
Taiwan High Speed Rail (THSR) is the high-speed railway network in Taiwan, which consists of a single line that runs approximately 350 km(217 mi) along the western coast of the island, from the capital Taipei in the north to the southern city of Kaohsiung. With construction and operations managed by a private company, Taiwan High Speed Rail Corporation (THSRC), which also operates the line, the total cost of the project was Template:Ntd billion in 1998.[2] The system's technology is based primarily on Japan's Shinkansen.
The railway opened for service on 5 January 2007, with trains running at a top speed of 300 km/h(186 mph), currently running from Nangang to Zuoying in as little as 1 hour and 45 minutes, reaching almost 90% of Taiwan's population. Most intermediate stations on the line lie outside the cities served; however, a variety of transfer options, such as free shuttle buses, conventional rail, and metros have been constructed to facilitate transport connections.
Ridership initially fell short of forecasts, but grew from fewer than 40,000 passengers per day in the first few months of operation to over 129,000 passengers per day in June 2013.[3] Daily passenger traffic reached 130,000 in 2014, well below the forecast of 240,000 daily passengers for 2008.[4] The system carried its first 100 million passengers by August 2010 and over 200 million passengers had taken the system by December 2012,[5] followed by 400 million by December 2016.[6] THSR, or railways in general, is only located on the main island of Taiwan. Outer islands under the control of the ROC government including Penghu, Kinmen, and Matsu do not have railways.
In the initial years of operation, THSRC accumulated high debts due to high depreciation charges and interest, largely due to the financial structure set up for the private company. In 2009, THSRC negotiated with the government to change the method of depreciation from depending on concessions on rights to ridership.[7] At the same time, the government also started to help refinance THSRC's loans to assist the company so it could remain operational and profitable.[8] The government injected NT$30 billion as a financial bailout, boosting the government's stake to about 64% from about 37%.[4] The government also extended the rail concession from 35 years to 70 years and terminated the company's build-operate-transfer business model.[9]
History
[编辑]Taiwan's rapid economic growth during the latter half of the twentieth century led to congestion of highways, conventional rail, and air traffic systems in the western transport corridor, which threatened to impede the region's development.[10][11]:125 The idea of a new high-speed rail line arose in the 1970s,[10] and informal planning began in 1980.[12] In 1987, the executive branch of Taiwan's government, the Executive Yuan, instructed the Ministry of Transportation to launch a feasibility study for a high-speed rail line in the western Taiwan corridor,[10] which was completed in 1990.[13] The study found that in a comparison of potential solutions to traffic problems in the corridor, a high-speed rail line would offer the highest transit volume, lowest land use, highest energy savings, and least pollution.[10] In July 1990 the Preparation Office of High Speed Rail (POHSR) was established[10] and a route was selected in 1991.[12] Plans for the THSR were subsequently approved by the Executive Yuan in June 1992[10] and by Taiwan's legislature, the Legislative Yuan, in 1993.[13]
Build-Operate-Transfer
[编辑]
In November 1994, Taiwan passed a law regarding the use of private finance in infrastructure projects, which also applied to the up-to-then state-run THSR project.[10] Consequently, in 1995, POHSR was transformed into the Bureau of High Speed Rail (BOHSR), which started to tender THSR as a build-operate-transfer (BOT) scheme in October 1996.[10][13]
The bidding process pitted Taiwan High Speed Rail Consortium (THSRC) against the Chunghwa High Speed Rail Consortium (CHSRC). THSRC's bid was based on the high-speed technology platform of Eurotrain, a joint venture between GEC-Alsthom, the main maker of the French TGV, and Siemens, the main maker of the German ICE, while CHSRC's bid was based on Japanese Shinkansen technology supplied by Taiwan Shinkansen Consortium (TSC), a joint venture of Japanese companies.[14] THSRC, which submitted the lower bid and promised to build the line with zero net cost from the government, was chosen as the preferred bidder in September 1997.[14] The group was renamed and formally established as the Taiwan High Speed Rail Corporation (THSRC) in May 1998.[15][16][17] THSRC and the government signed the BOT agreement on 23 July 1998.[18]
However, controversy arose during rolling-stock selection. In May 1999, as THSRC faced difficulties in raising capital, the government of Japan promised soft loans if THSRC switched to TSC.[19] Although Eurotrain promised to match TSC's financial proposal, the Eschede train disaster in combination with TSC offering the newer 700 Series Shinkansen, convinced THSRC to reopen its core system bid, ultimately resulting in TSC selected as the preferred rolling-stock supplier in December 1999. Although Eurotrain eventually conceded in the bid, in February 2001 it filed for a US$800 million damage claim against THSRC at the Singapore International Arbitration Centre. After a lengthy arbitration process, the court ruled in March 2004 that THSRC should pay a compensation for the US$32.4 million Eurotrain spent on development and US$35.7 million for unjust enrichment.[20] THSRC agreed to pay US$65 million (US$89 million with interest) to Eurotrain in November 2004.[21]
Construction
[编辑]Construction of the line by THSRC officially started in March 1999.[22] Tunnels and other major civil engineering works were completed by 2004,[23] along with the first delivery of the 700T trains.[24] Testing and commissioning of the line then took place in 2005 and 2006,[25] with a maximum testing speed of 315千米每小时(196英里每小时) achieved in October 2005.[26]
Opening
[编辑]
The railway was opened in 2007,[27] with limited commercial services between Banqiao and Zuoying stations from 5 January,[28][29] with full service from Taipei Station to Kaohsiung from May 2007.[30]
Three additional stations located along the line – Miaoli, Changhua and Yunlin – opened in 2015.[31]
Future plans
[编辑]Southern extension
[编辑]On 10 September 2019, the Executive Yuan announced that the railway would be expanded to Pingtung. Out of four proposed route options, it was confirmed on 27 September that the expansion would bypass central Kaohsiung, branching from Zuoying east towards western Pingtung City, near Lua错误:expandTemplate: template "Taiwan Railways stations" does not exist。, with an estimated cost of NT$55.4 billion. Although lowest in cost, the option was met with criticism regarding its economic benefits.[32][33]
The extension to Pingtung was approved by Premier Su Tseng-chang in January 2023, with opening of the extension planned for 2029.[34][35]
On 28 December 2024, Executive Yuan announced that the extension route would be altered to pass through the city centre with a stop at Kaohsiung Main Station.[36]
Northern extension
[编辑]The line was extended 9.2 km(5.7 mi) from Taipei to Nangang, opening in July 2016.[37]
On 25 October 2019, the Railway Bureau published an assessment report to extend the line further from Taipei to Yilan, cutting travel time to 13 minutes.[38] The 56.4 km(35.0 mi) extension was approved in October 2020,[39] and is planned to open by 2030.[40]
Rolling stock
[编辑]THSR 700T
[编辑]
Taiwan High Speed Rail started operation with 30 THSR 700T trainsets supplied by a consortium led by Kawasaki Heavy Industries.[24][41] In response to increasing ridership and new stations that would begin operation in 2015, THSRC signed the contract for four new 700T trainsets with the Kawasaki consortium in May 2012 in Tokyo, Japan.[42][43] The first (TR 31) trainset was delivered to Taiwan on 23 December 2012; the second (TR 32) on 21 January 2013; the third (TR33) on 25 January 2014; the fourth (TR34) on 12 August 2015.[44][45]
The THSR 700T trainset is based on the 700 Series Shinkansen trainset used by JR Central and JR West in Japan.[46] This marked the first time Shinkansen technology was exported to a foreign country,[47] and it involved "rolling stock derived from a JR Central design running on both the European and Japanese track systems."[48] Customization was focused on adapting to Taiwan's climate and geography, and the nose shape was optimized for tunnels wider than those in Japan.[41][46][49]
The maximum service speed of the trains was raised from the 700 Series Shinkansen's 285至300 km/h(177至186 mph).[49] The 12 cars of a 700T train are grouped in three traction units with three power cars and one trailer each,[46] providing 10.26 MW(13,760 hp) of power;[50] both end cars are trailers to avoid slip on powered bogies.[46] The train is 304米(997英尺5英寸) long and has a mass of 503 t(554 short ton) when empty.[50] The trains have a passenger capacity of 989 seats in two classes: 66 seats in 2+2 configuration in the single Business Car and 923 seats in 2+3 configuration in the eleven Standard Cars.[41] The per capita energy consumption of a fully loaded 700T train is 16% of that of private cars and half that of buses; carbon dioxide emissions are 11% of private cars and a quarter that of buses.[13]
N700S
[编辑]In the late 2010s, THSRC began work to purchase additional high speed trains, in light of growing demand.[51] 12 trains would be ordered, at a cost of around NT$30 billion.[51] Due to the limited number of Japanese companies who build Shinkansen rolling stock, it took several years for THSRC to agree an acceptable deal.[52][53] In 2022, it was reported that THSRC was speaking to European train manufacturers instead, as the price offered by Japanese companies was "unreasonable".[54]
In March 2023, it was announced that a joint bid by Hitachi and Toshiba had been awarded the contract. Twelve of the latest generation of Shinkansen train—the N700S Series—would be delivered at a cost of NT$28 billion.[55][53]
Engineering trains
[编辑]

THSRC uses overhead line inspection trains from Windhoff, Harsco railgrinders, Plasser & Theurer track tampers, and several ex-JR rolling stock to maintain its line.[56] Among the latter include the JNR Class DD14 and JNR Class DD16 diesel-hydraulic locomotives, which were originally used for snowploughing by JR. The two ex-JR locomotives with THSRC are equipped with Shinkansen-style rotary couplers and standard-gauge bogies instead of the original Error: gauge specification "1067 mm" not known gauge bogies and knuckle couplers and are used for shunting the 700T trainsets within the depot. THSRC also uses a former 0 Series Shinkansen end car as a structure gauge test car.
Operation
[编辑]As the first high speed railway system in Taiwan, THSRC started operation in 2007 with many foreign employees, including French and German train drivers and operation controllers in the Operation Control Center (OCC).[57] At the same time, THSRC also started to train local drivers and controllers. Since May 2008, all controllers working in the OCC have been Taiwanese, and since October 2008, all train drivers have been Taiwanese.[58]
The OCC's main responsibility is to maintain safe train operations. THSRC has 132 controllers (July 2012), of which about one quarter are female, working 24 hours per day and 365 days per year in the OCC. Requirements for becoming a Chief Controller (主任控制员) include experience in all nine OCC positions, 300-hours of on-the-job training and acquiring qualification.[59]
THSRC has 144 drivers (July 2012), of which almost 10% are female. All driver candidates must spend 8 months completing 1,326 hours of professional training and pass the National Certification before they can drive the train. In addition, after becoming a certified high-speed train driver, they undergo further on-the-job training at least three times each year in order to guarantee they can drive the train safely.[59]
Natural disasters
[编辑]Taiwan frequently faces multiple types of natural disasters, including typhoons, earthquakes, heavy rainfall, floods, and landslides. For this reason, a primary focus of THSRC's infrastructure design was how to respond to natural disasters such as earthquakes[60] and how to ensure safety for all passengers and trains in any emergency situation.[61]
THSRC has established a system to respond to natural disasters and unexpected intrusion onto the right-of-way, called DWS (Disaster Warning Systems).[61] This system consists of a network of sensors installed along the rail route to detect unexpected situations such as earthquakes, strong winds, heavy rainfall, floods, landslides, and intrusions. In case of an unexpected situation, the DWS will send signals to the OCC (Operation Control Center) immediately; it will also activate contingency measures to ensure the safety of the passengers and trains, including decelerating or stopping trains in the affected area.[60]
The DWS has functioned successfully since its initial operation in 2007. The most powerful earthquake that THSRC has experienced measured 6.4 on the Richter Scale with an epicenter 17 km(11 mi) from Jiaxian, Kaohsiung that shook southern Taiwan on 4 March 2010 (甲仙地震). One operating train was slightly derailed in Sinshih, Tainan, and six trains were stopped on the track. In spite of the temporary suspension of operations, there was no damage or casualties. All 2,500 affected passengers were evacuated in two hours without injury. Service resumed the next day.[8] Such a record was well noted, and provided valuable experience in operational safety to the global railway industry.[8]
In April 2010, it was reported that subsidence had been observed during construction on a 6 km(3.7 mi) viaduct section in Yunlin County.[62] The subsidence continued, reaching up to 55 cm(22英寸) over seven years.[63] By 2010 subsidence had slowed, which was ascribed to the closure of some deep groundwater wells operating in the region. Although the situation was deemed safe with differential settlement between adjacent piers along the viaduct at only a sixth of the permissible level, the BOHSR urged the closure of more wells.[63][64] On 25 July 2011, the government announced plans to close almost 1,000 wells in Changhua and Yunlin counties, reducing the amount of water pumped from deep wells by 210,000,000公吨(2.1×1011千克) by 2021.[65]
Service
[编辑]According to THSR's July 2018 timetable,[66] there are 989 train services per week of operation, with operation times between 05:50 to 24:00 every day. Most southbound trains originate from Nangang station and most northbound trains originate from Zuoying; however, a few trains operate just between Nangang and Taichung or between Taichung and Zuoying. Southbound trains are designated by odd train numbers, and northbound trains by even train numbers.[67]
Each train consists of 1 business car (car 6) and 11 standard cars (including reserved seats and non-reserved seats). Since July 2010, non-reserved seats are available in cars 10 through 12 (some trains available in cars 9 through 12 or available in cars 8 through 12 ). Car 7 of each train is fitted with 4 wheelchair accessible chairs and a disabled-friendly restroom. Passengers can call THSR's Customer Service Hot Line at (Taiwan) 4066-3000 or visit any THSR station ticket window to reserve these seats.[67]
By August 2012, implementation of 4G WiMAX on-board trains is expected to provide smooth wireless broadband services, making THSR the first high-speed ground transportation system equipped with this service.[68]
In 2012, THSRC rated highly in the CommonWealth Magazine (天下杂志) "Golden Service Award survey" (金牌服务大赏), not only far outpacing all rivals in the "long-distance land transport" category, but also taking the top spot in the overall rankings of 300 industries.[69]
Local connections
[编辑]To improve local public transit connections to THSR stations, the TRA built two new spur lines branching off from West Coast Line.
- Shalun Line for Tainan opened on 2 January 2011,[70]
- Liujia Line for Hsinchu opened on 11 November 2011.[71]
Code | Name | Chinese | Taiwanese | Hakka | Connecting services and Notes | Distance (km)[72][73] | Type[13] | Location | ||
---|---|---|---|---|---|---|---|---|---|---|
NAG | 01 | Nangang | 南港 | Lâm-káng | Nàm-kóng | ![]() ![]() |
3.2 | underground | Nangang | Taipei |
TPE | 02 | Taipei | 台北 | Tâi-pak | Thòi-pet | ![]() ![]() ![]() (A1 Taipei Main) 200 m |
6.1 | underground | Zhongzheng | |
BAQ | 03 | Banqiao | 板橋 | Pang-kiô | Piông-khièu | ![]() ![]() |
13.1 | underground | Banqiao | New Taipei |
TAY | 04 | Taoyuan | 桃園 | Thô-hn̂g | Thò-yèn | (A18 Taoyuan HSR) Airport Shuttle Bus |
42.3 | underground | Zhongli | Taoyuan |
HSC | 05 | Hsinchu | 新竹 | Sin-tek | Sîn-tsuk | ![]() |
72.2 | elevated | Zhubei | Hsinchu |
MIL | 06 | Miaoli | 苗栗 | Biâu-le̍k | Mèu-li̍t | ![]() |
104.9 | elevated | Houlong | Miaoli |
TAC | 07 | Taichung | 台中 | Tâi-tiong | Thòi-chûng | ![]() Taichung Metro: ![]() |
165.7 | elevated | Wuri | Taichung |
CHH | 08 | Changhua | 彰化 | Chiong-hoà | Chông-fa | 193.9 | elevated | Tianzhong | Changhua | |
YUL | 09 | Yunlin | 雲林 | Hûn-lîm | Yùn-lìm | 218.5 | elevated | Huwei | Yunlin | |
CHY | 10 | Chiayi | 嘉義 | Ka-gī | Kâ-ngi | ![]() |
251.6 | elevated | Taibao | Chiayi |
TAN | 11 | Tainan | 台南 | Tâi-lâm | Thòi-nàm | ![]() |
313.9 | elevated | Gueiren | Tainan |
ZUY | 12 | Zuoying | 左營 | Chó-iâⁿ | Chó-yàng | ![]() ![]() |
345.2 | ground level | Zuoying | Kaohsiung |
Stop patterns
[编辑]With a few exceptions, the services follow the below pattern.
Code[b] | Number[c] | Category | Nangang | Taipei | Banqiao | Taoyuan | Hsinchu | Miaoli | Taichung | Changhua | Yunlin | Chiayi | Tainan | Zuoying | Service proportion |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
D | 6xx, 16xx | Semi-Fast Train (Frog Mode) | ▲[d] | ● | ● | ● | ● | - | ● | - | - | ● | ● | ● | 36.0% |
F | 8xx, 18xx | Stopping Train | ● | ● | ● | ● | ● | ● | ● | ● | ● | ● | ● | ● | 22.7% |
B | 1xx, 11xx | Fast Train (Direct to Zuoying) | ● | ● | ● | - | - | - | ● | - | - | - | - | ● | 20.5% |
B' | 2xx, 12xx | Fast train (Call at Tainan Mode) | ▲[e] | ● | ▲[f] | - | - | - | ● | - | - | ○[g] | ● | ● | 9.2% |
E | 5xx, 15xx | Stopping Train (Local Mode)[h] | ● | ● | ● | ● | ● | ● | ● | N/A | 8.5% | ||||
583, 598, 1588 | N/A | ● | ● | ● | ● | ● | 0.2% | ||||||||
C | 295, 300, 333, 13xx | Taoyuan Airport Express Train[i] | ● | ● | - | ● | - | - | ● | ▲[j] | ▲[k] | ● | ● | ● | 2.9% |
A | 0xx, 10xx | Super-Fast Train | ● | ● | - | - | - | - | - | - | - | - | - | ● | Reserve in Future |
as of July 2019; ●: Trains stop at station; ○: Section trains stop at station; ▲: Section Trains skip station; -: Trains skip station |
Ticket fare and discount
[编辑]

As of January 2018, a one-way Taipei–Zuoying trip, a THSR standard car adult ticket is NT$1490, and a business car ticket fare is NT$1950.[67] The cost of a non-reserved seat is approximately 3% less than the regular price. Business and standard car reserved ticket reservations are available 28 days prior to the date of departure (including the departure day).[67]
Senior citizens (Taiwan citizens above 65 years of age), registered disabled persons plus one accompanying passenger (Taiwan citizens only), and children (passengers under 12 years of age) are eligible for concession (half price) tickets.[67]
A group discount is offered for groups of 11 or more. A group discount cannot be used in combination with other discount offers and does not include non-reserved seats. Passengers eligible for multiple discounts can only choose one discount offer.[67][74][75]
Since 1 July 2010, a smart card system has provided frequent travelers with multi-ride (eight trips) or periodic tickets. THSR's contact-less smart cards allow the cardholder to travel between specific stations within a given time period for a certain number of rides. The card is sold in either registered (name-bearing) or non-registered form. Only adult tickets are available in this format, and cannot be used for rides between Banqiao and Taipei.
After purchasing or adding value to a multi-ride card, the card balance is valid for 45 days counted from the day of first use. The ticket is good for 8 rides. The multi-ride card provides a discount of about 21% off the full fare of a reserved Standard Seat. Non-registered and registered multi-ride tickets can be purchased at the ticket windows of all THSRC stations. Upon first purchase of a multi-ride ticket, a card deposit fee of NT$100 is required (refundable if the card is returned). The registered multi-ride ticket is limited to personal use by the registered cardholder.[76][77] Since November 2012, an Early Bird discount of 35% has been offered for a limited number of tickets sold no later than 8 days before the departure date. If the 35% off tickets sell out before the deadline, tickets with a discount of 20% off are offered. If these tickets sell out before the deadline, tickets with a discount of 10% off are offered. If all early bird tickets are sold out, then full fare tickets are offered.[78]
Train frequency
[编辑]
Direction | Trains per day | Trains per week | ||||||
---|---|---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun | ||
Southbound | 63 | 64 | 82 | 75 | 76 | 488 | ||
Northbound | 69 | 68 | 80 | 70 | 86 | 509 | ||
Both directions | 132 | 162 | 145 | 162 | 997 |
THSRC operates additional train services during national holidays.[80] On 29 June 2011, a proposal by THSRC to increase the maximum number of train services to 210 per day (compared to the existing 175 per day) passed an environmental impact assessment, increasing the number of possible services on "high-load days".[81]
Ridership
[编辑]
Original estimates predicted a daily ridership of 180,000 after launch, growing to 400,000 by 2036.[82] In view of a 50% drop in airline passengers due to the 1997 Asian financial crisis, forecasts were revised downwards.[13] The final initial ridership estimate was 140,000 passengers per day.[83] Actual initial ridership did not match these projections. In September 2007, six months after opening, THSRC carried 1.5 million passengers monthly,[84] translating to about 50,000 passengers daily. In the second year, passenger numbers almost doubled.[85] In the third year, average daily ridership continued to grow to 88,000 passengers per day, jumping to over 120,000 passengers per day in 2012. (updated to September 2012)[86][87] Seat occupancy was around 45% in the first three years, with a modest improvement achieved in 2009, and reached 53.91% in 2012. (updated to September 2012)[88] Punctuality is stable above 99%.[89]
Year | Ridership | Seat-km | Passenger-km | Seat occupancy(%): | Train-km | Passenger Car km | Punctuality (less than 5 mins) |
---|---|---|---|---|---|---|---|
2007 | 15,558,356 | 7,838,644,289 | 3,520,173,426 | 44.91 | 7,925,828 | 95,109,936 | 99.47% |
2008 | 30,581,261 | 15,089,499,008 | 6,566,119,575 | 43.51 | 15,257,330 | 183,087,960 | 99.19% |
2009 | 32,349,260 | 14,821,653,184 | 6,863,960,208 | 46.31 | 14,986,505 | 179,838,060 | 99.25% |
2010 | 36,939,596 | 15,296,119,539 | 7,491,019,590 | 48.97 | 15,466,248 | 185,594,976 | 99.21% |
2011 | 41,629,303 | 15,781,051,602 | 8,147,869,493 | 51.63 | 15,956,574 | 191,478,888 | 99.87% |
2012 | 44,525,754 | 15,829,068,364 | 8,641,573,257 | 54.59 | 16,005,125 | 192,061,500 | 99.40% |
2013 | 47,486,229 | 15,858,327,738 | 9,118,060,276 | 57.50 | 16,034,710 | 192,416,520 | 99.38% |
2014 | 48,024,758 | 16,167,495,855 | 9,235,162,292 | 57.12 | 16,347,317 | 196,167,804 | 99.61% |
2015 | 50,561,954 | 16,186,948,588 | 9,654,960,687 | 59.65 | 16,366,984 | 196,403,808 | 99.66% |
2016 | 56,586,210 | 16,512,526,628 | 10,488,339,832 | 63.52 | 16,696,185 | 200,354,220 | 99.43% |
2017 | 60,571,057 | 17,040,173,121 | 11,103,358,620 | 65.16 | 17,229,700 | 206,756,400 | 99.72% |
2018 | 63,963,199 | 17,249,709,128 | 11,558,787,218 | 67.01 | 17,441,565 | 209,298,780 | 99.43% |
2019 | 67,411,248 | 17,629,990,176 | 11,994,452,919 | 68.03 | 17,826,078 | 213,912,936 | 99.88% |
2020 | 57,238,942 | 17,407,300,140 | 9,912,062,318 | 56.94 | 17,626,356 | 211,516,272 | 99.72% |
2021 | 43,459,558 | 15,175,274,282 | 7,568,787,566 | 49.88 | 15,532,523 | 186,390,276 | 98.75% |
2022 | 54,162,008 | 17,516,589,784 | 9,338,060,508 | 53.31 | 17,928,956 | 215,147,472 | 99.47% |
2023 | 73,086,668 | 17,779,654,904 | 12,564,568,569 | 70.67 | 18,198,214 | 218,378,568 | 99.57% |
![]() | 由于已知的技术原因,图表暂时不可用。带来不便,我们深表歉意。 |
![]() | 由于已知的技术原因,图表暂时不可用。带来不便,我们深表歉意。 |
The 10-millionth passenger was carried after 265 days of operation on 26 September 2007,[84] while the 100-millionth passenger was carried after 1,307 days on 3 August 2010,[91] and 200-millionth by December 2012.[92] On 10 October 2011, the Double Ten Day holiday, THSRC transported a single-day record of 189,386 passengers. On 5 February 2011, the third day of Chinese New Year’s celebration, a new record of 190,596 passengers was achieved. The next single-day record was reached on 25 January 2012, also the third day of Chinese New Year's celebration, at 191,989 passengers. The most recent record is 212,000 passengers transported on 1 January 2013.[92]
The high-speed trains have successfully out-competed planes: by August 2008, half of the air routes between Taipei and the country's western cities had been discontinued, including all connections between cities with THSR stations except for a single daily connection between Taipei and Kaohsiung.[93][94] Total domestic air traffic was expected to be halved from 2006 to 2008,[93] and actually fell from 8.6 to 4.9 million.[95] In June 2012, officials announced the discontinuation of the last remaining commercial flight between Taipei and Kaohsiung.[96] The share for conventional rail between Taipei and Kaohsiung fell from 9.71% in 2006 to 2.5% in 2008, while high-speed rail became the most common mode of transport at 50% of all trips by 2008.[97] The opening of THSR led to a 10% reduction of traffic on the parallel expressway in 2007.[98] Despite cheaper ticket prices, long-distance bus companies reported that passenger volumes had fallen by 20 to 30 percent by 2008.[99]
Infrastructure
[编辑]
Construction of the system took more than 2,000 professional engineers from 20 countries and over 20,000 foreign and domestic workers six years to complete.[100] Construction work was broken into several specialized lots that were contracted separately.[101] One group of contracts was for civil works, covering the construction of the superstructure of open line sections.[101] Stations and depots were the subject of separate groups of construction contracts.[101] A fourth group of contracts was for track work.[101][102]
The Taiwan North-South High Speed Rail Project was awarded the first prize for the Outstanding Civil Engineering Project Award by the Asian Civil Engineering Coordination Council (ACECC) in Sydney in 2010.[103]
In 2011, the Public Construction Commission (公共工程委员会) organized an on-line voting campaign that garnered over 330,000 votes, to select the 100 best infrastructure projects (百大建设) in Taiwan to celebrate the centennial of the Republic; Taiwan High Speed Rail topped the list.[104]
Track
[编辑]
Reflecting a design speed of 350 km/h(217 mph),[105] track layout was designed with a minimum curve radius of 6,250米(20,505英尺), track-centre distance of 4,500 mm(177.2英寸),[13] right-of-way width of 18米(59英尺1英寸), and a maximum gradient of 2.5%, except for 3.5% at one location.[106] All but 3 km(1.9 mi) of track is ballastless,[49] combining slab track of Japanese manufacture on open line sections with switches from a German supplier.[107][108] Track laying began in July 2003.[109] The line was electrified with the 25 kV/60 Hz AC system.[105] The signalling and train control system was laid out for bi-directional operation according to European specifications.[107] Each track section has a checkpoint, and an automatic control system ensures that trains are spaced at least 1 km(0.62 mi) apart to prevent collisions.[110]
Most of the line is elevated.[105][111] About 251 km(156 mi) or 73% of the line runs on viaducts,[105] mostly precast pre-stressed concrete box girder spans,[111] the first of which was put in place in October 2001.[112]
The Changhua-Kaohsiung Viaduct is a 157,317米(97.752 mi) continuous section from Baguashan (八卦山) in Changhua County to Zuoying in Kaohsiung. It was the second longest bridge in the world as of 2017.[100][113] Viaducts were designed to be earthquake resistant to allow for trains to stop safely during a seismic event and for repairable damage following a maximum design earthquake.[114] Bridges built over known fault lines were designed to survive fault movements without catastrophic damage.[115]
About 61 km(38 mi)[116] or 18% of the line is in tunnels, including 14 km(8.7 mi) of the TRUPO section in Taipei,[106] as well as 48 tunnels with a total length of 46,257米(28.743 mi) on the other sections,[117] the longest of which is Paghuashan Tunnel, at a finished length of 7,364米(24,160英尺).[118] Forty-two of the tunnels included a total of 39,050米(24.265 mi) of mined sections, all of which were bored with the sequential excavation and support construction method, with excavated tunnel faces of 135—155 m2(1,450—1,670 sq ft), between November 2000 and July 2003.[111] The finished interior cross-sectional area of 90 m2(970 sq ft),[106] set according to wider European standards,[107] provides space for two tracks with safety walkways.[105]
After four months of delays, trial runs using the first THSR 700T trains began on 27 January 2005, on the Tainan–Kaohsiung section.[119] On 30 October 2005, a day after a test run passed the planned top service speed of 300 km/h(186 mph),[120] the targeted maximum test speed of 315 km/h(196 mph) was achieved.[121] The section between Banqiao (Taipei) and Zuoying (Kaohsiung) opened to the public on 5 January 2007.[122] The HSR platforms at Taipei Station opened on 2 March 2007, bringing the entire line into operation.[123]
Stations
[编辑]A distinctive feature of the system's station placement is that many are located at the periphery of urban areas, rather than within city centers. The decision was made with the expectation that the stations would act as centers for planned communities and thus increase the property values of the surrounding area. A study in 2010 showed that this isn't the case,[11]:126–127 but later analyses show that property prices around certain stations have indeed risen.[124][125] Since the THSR's opening, cities have gradually expanded their mass transit systems to connect with these stations.
Environmental issues
[编辑]
Environmental mitigation measures in the line's construction phase included the construction of animal bridges over the line, the planting and re-planting of trees along the track as noise screens,[49] and the purchase of farmland to create a preservation area for jacana birds away from the line.[126]
THSRC is involved in the preservation of the pheasant-tailed jacana, which is considered endangered in Taiwan. An artificial habitat recovery project was completed in collaboration with the local government, country development organizations and non-profit organizations for a cost of NT$50 million. In 2007, the recovery habitat was officially renamed the "Pheasant-tailed Jacana Eco-Educational Nature Park" and since then, it has opened to the public. THSRC arranges for elementary and junior high school students to visit the park annually.[127]
[128] A 330 year old camphor tree and a temple in Hsinchu County are located on the main route of the THSR, and both of them faced removal because of railway construction. The temple established beside the old tree serves as a major religious site for the local community.[来源请求] In 1998, THSRC adjusted the line and design to keep the tree and temple in their original place and cooperated with the local government and people to protect the old tree and the temple until today. Afterwards, together with the local government, the Environment and the Resources Protection Committee, and cultural and historical authorities, THSRC drafted the Hsinchu Old Camphor Tree Medical Plan, which called for the repair of decayed branches as well as measures designed to maintain the long-term growth and the health of the tree.[128][129]
Financial
[编辑]Revenue and cost
[编辑]Item | 2007[130] | 2008[131][132] | 2009[132][133] | 2010[133] | 2011[134] | 2012[135] | 2013[136] | 2014[137] | 2015[137] | 2016[137] | 2017[138] | 2018[139] |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Ticket revenue(A) | 13,155,221 | 22,441,012 | 22,800,753 | 27,025,822 | 31,556,782 | 33,263,223 | 42,221,888 | 44,098,796 | ||||
Other operating revenue(B) | 347,567 | 606,571 | 522,959 | 609,529 | 679,723 | 720,914 | ||||||
Operating revenue(C=A+B) | 13,502,788 | 23,047,583 | 23,323,712 | 27,635,351 | 32,236,505 | 33,984,137 | 36,101,166 | 38,510,000 | 51,901,392 | 40,610,906 | 43,435,042 | 45,415,007 |
Depreciation | −18,589,587 | −18,994,251 | −8,222,634 | −9,411,998 | −10,647,252 | −11,206,236 | ||||||
Operating income | −14,909,057 | −6,238,553 | 5,564,846 | 9,071,545 | 12,058,405 | 12,095,229 | 11,394,464 | 11,880,000 | 20,556,496 | 13,699,496 | 17,754,984 | 19,144,964 |
Financial revenue | 315,187 | 644,500 | 639,869 | 230,348 | 248,318 | 633,040 | ||||||
Interest | −14,423,091 | −17,464,896 | −10,778,335 | −8,912,483 | −8,854,892 | −8,737,156 | −9,256,852 | −8,375,559 | −7,463,329 | −6,618,272 | ||
Net pre-tax income | −29,398,694 | −25,009,697 | −4,791,125 | -1,210,889 | 5,783,743 | 3,956,828 | 2,710,000 | 2,660,000 | 18,833,835 | 4,997,575 | 6,478,500 | 7,311,823 |
Tax/tax refund | −54 | 0 | 1,670 | 848 | −2,597,914 | −379,992 | −579,439 | 2,038,795 | −848,477 | −1,138,595 | 3,384,558 | |
Net income | −29,398,748 | −25,009,697 | −4,789,455 | −1,210,041 | 3,185,833 | 3,576,836 | 3,288,951 | 5,520,000 | 20,872,630 | 4,149,098 | 5,339,905 | 10,696,381 |
All figures are in thousands of NT$. |
Most of THSRC's revenue comes from ticket sales; supplemental income comes from other activities such as advertising and renting spaces for standing shops and spots in plazas. Advertising spots on trains and station platforms have also been sold.[140] Revenues grew along with ridership over the first three years, but ridership remained below expectations. In 2008 the second year of operation, revenues fell barely short of THSRC's expectations a year earlier of a doubling of first-year results.[85][141]
The cost of running the trains and infrastructure, or cash operating costs, was initially over NT$1 billion a month,[142] but was reduced to around NT$850–900 million in 2008.[143] Revenues first exceeded this level, thus generating a positive operating cash flow, in the fourth month of operation (April 2007).[144]
For THSRC, the over heavy accounting of the fixed cost of fixed assets like rolling stock and infrastructure (depreciation) is a significant non-cash element of total operating costs. In its first two years of operation, THSRC applied straight-line depreciation, distributing costs evenly over a period of 26.5 years.[145] As a result, the balance of operating revenues and costs (operating income) showed a high loss in the first year of operation, which was only reduced as revenues grew in the second year. The depreciation period set for THSRC reflected the length of the B.O.T. concession rather than the much longer lifespan of the infrastructure,[145] and it is the factor for the operating loss.[146] After adopting an activity depreciation method which is variable in time,[147] THSRC posted its first operating profit for 2009, the third year of operation.[148] The company reported its first annual profit of NT$5.78 billion after five years of operation.[149]
For the first time in its five-year operation, the Company reported a net income of NT$5.78 billion, with earnings per share of NT$0.59.[102] Revenues increased by 16.65% from NT$27.64 billion to NT$32.24 billion, with operating costs and expenses (excluding depreciation and amortization) rising by only 4.98%. Over the same period of time, gross profit totaled NT$12.98 billion (an increase of 30.32%), income from operations totaled NT$12.06 billion (an increase of 32.93%) and EBITDA totaled NT$22.73 billion (an increase of 22.34%). 2011 gross profit, income from operation and EBITDA were all record highs.[102] Since commencing operations in 2007, THSRC has had a significant influence on Taiwan's economy and on the lives of its people. In 2011, the Company continued to pursue sustainable growth aligned with the interests of shareholders and society, achieving record profits even amid a challenging economic environment.[102]
The interest cost is another major item of this company's financing. In the first few years of operation, interest rates were well above market rates.[150][151] Interest expense per month stood at around NT$1.3 billion in 2008, when THSRC first achieved break-even cash flow, with revenue and cash expenses (which exclude depreciation) both around NT$2.1 billion in 2008.[143] Interest rates fell in the first half of 2009, reducing interest expenses[147] and contributing to a reduced net loss.[148]
In 2010, THSRC obtained a new syndicate loan to alleviate its imminent financial burden. The company signed a NT$382 billion refinancing contract with a consortium of eight domestic banks led by the Bank of Taiwan, and used the new loan to pay off the previous syndicated loan, which had higher interest.[8] 截至2011年[update], the long-term debts totalling NT$385 billion included NT$26 billion in corporate bonds and NT$359 billion in bank loans. In comparison with the terms and conditions of previous loans, the refinancing debts carried lower interest rates and longer tenors, up to 22 years.[8]
Financial and loan
[编辑]In cumulative figures, until July 2008, depreciation and interest were equal to 95% of THSRC's accumulated debt.[151] Both THSRC[146] and a September 2009 government report[150] identified an unreasonable financial structure and the resulting high interest rates and high depreciation charges as the main causes of negative financial performance, while the government assessed THSRC to have performed well in its core business, as measured by earnings before interest, taxes, depreciation and amortization (EBITDA).[145] To reduce its interest load, THSRC sought to revise its loan structure in 2008[152] and again in 2009.[153][154] To reduce depreciation costs by increasing the amortization time, THSRC requested an extension of its 35-year concession period.[145]
By the summer of 2009, THSRC's cumulative losses were equivalent to two-thirds of its equity capital. In response to the 2008 financial crisis and the Great Recession, THSRC proposed to increase income and reduce expenditures in several aspects in the hope of raising operation performances. In February 2009, THSRC announced to adjust train frequency, cut down salary payment by 10~20% among management level, and measured to expand fare promotion to stimulate ridership. While the media questioned whether the planned construction of three more intermediate stations and the extension to Nangang would be postponed, THSRC published press release on 28 September 2009, stating that the company will comply with "Taiwan High Speed. Rail Construction and Operation Contract", and the construction project of 3 intermediate stations, namely Miaoli, Changhua and Yunlin will be initiated in July 2012, and is scheduled to start its operation from 2015. By the time of completion, there will be a total of 12 stations along the THSRC operation route.[155] The company was put under new management in September 2009 with the aim of turning around the company's finances with government help in arranging refinancing of the loans.[156]
The government took majority control of the company after the election of its new board on 10 November 2009.[157] In January 2010, when accumulated losses already exceeded NT$70 billion, THSRC signed a government-guaranteed refinancing deal in which eight government-dominated banks provided NT$382 billion at lower interest rates and longer maturity.[158] The government also approved the company's new variable depreciation charge.[148]
Incidents
[编辑]On 12 April 2013, suspicious luggage items were found inside the North bound train No. 616 toilet when it was heading towards THSR Hsinchu Station. The train was stopped at THSR Taoyuan Station and all of the passengers were evacuated. Later, it was determined the luggage contained an unidentified liquid in cans, alarm clock and white particulate matter. The items were dismantled by the bomb squad and taken for further investigation. Two KMT legislators, Hsu Hsin-ying and Lu Shiow-yen, were on board.[159][160]
Part of the tracks near Tainan were badly damaged during the earthquake on 6 February 2016. All high-speed rail services south of Chiayi Station were suspended until 7 February 2016.
On 10 May 2017, a non-passenger carrying train traveled in the opposite direction of the track from Zuoying to Tainan for 1 km(0.62 mi) due to human negligence.[161]
Due to the COVID-19 pandemic, the THSR, along with Taiwan Railway Administration and bus services nationwide, began to require all passengers to wear surgical masks as of 1 April. In addition, infrared sensors were set up at twelve stations to detect fevers, eating and drinking were prohibited on board the trains, trains and stations were disinfected more frequently, and the THSR cancelled all non-reserved seating tickets, which allowed for crowds of passengers to stand if no seats were available. It was reported that the switch to reserved seats only aimed to reduce crowding.[162][163]
Public relations activities
[编辑]THSRC conducts community engagement activities to raise its profile.
Since 2009, the company has organized an annual "Ride THSR and Join the Book Exhibition for Free" event to promote a national reading culture; school-age passengers from remote villages are given free admission to the Taipei International Book Exhibition and go there on a themed high-speed "reading train", which features a celebrity reading a book over the train's public address system.[102]
Since 2010, along with World Vision Taiwan, THSRC has run a tuition fee assistance program for thousands of underprivileged children, to which passengers contribute.[102]
Other events have been a cappella singers at stations; gift-giving to couples taking wedding photos at major stations; station tours for the public and experience-sharing with its fellow railway transportation operators; and in collaboration with non-profit organizations, thousands of free rides to underprivileged groups and families.[102]
Students at primary, secondary and tertiary level learn about high-speed rail and THSRC at "THSR Camps", held in partnership with the Railway Cultural Society of Taiwan, the National Chiao Tung University Railway Research Society, and the China Youth Corps.[102]
In popular culture
[编辑]The first film to feature THSR prominently was the 2007 Taiwanese movie Summer's Tail, directed by Cheng Wen-tang (鄭文堂).[164]
Railfan: Taiwan High Speed Rail, a 2007 train simulator video game developed jointly by Taiwanese company Actainment and Japanese company Ongakukan on the basis of the latter's Train Simulator series, featured real video and was the first Taiwanese game for Sony Computer Entertainment's PlayStation 3 system.[165] The "National Geographic" website chose travel by Taiwan's high speed train as the "Best winter trip” in 2013.[166]
See also
[编辑]Notes
[编辑]- ^ 以BOT模式特许经营至2067年。[1]
- ^ These codes are used for statistical purposes.
- ^ 3-digit numbers indicate daily services, while 4-digit numbers indicate services on particular days of a week.
- ^ Service 696 does not call at Nangang, terminating at Taipei.
- ^ Service 203 skips Nangang, departing from Taipei.
- ^ Service 1202 skip Banqiao.
- ^ Services 203, 1293 and 1202 call at Chiayi.
- ^ This Train Services is Mainly between at Nangang to Taichung Service Interval, section between at Nangang to Taichung Services has 8-Car Non-Reserved Cars (Car 1-3,8-12) , the between at Taichung to Zuoying Service Interval is only single-round trip (Service 583 and 598), because overlapping the Taoyuan International Airport Express (Service 295, 300, 333 and 13xx) with between at Taichung to Zuoying Interval is All-Stop Pattern.
- ^ This Train Services is between at Nangang to Taichung Interval is only calls at Nangang, Taipei, Taoyuan and Taichung Stations, and between at Taichung to Zuoying Interval is All-Stop Pattern.
- ^ Service 295 skip Changhua.
- ^ Service 295 skip Yunlin.
References
[编辑]- ^ HSR Planning. www.hsr.gov.tw. [5 May 2017]. (原始内容存档于13 March 2016).
- ^ 計畫介紹. www.hsr.gov.tw. [12 January 2018]. (原始内容存档于10 December 2017) (中文).
- ^ Shan, Shelley. Local drivers pass high speed rail exams. Taipei Times. 27 May 2007 [4 March 2011]. (原始内容存档于28 June 2011).
- ^ 4.0 4.1 'Shinkansen' operation a flop in Taiwan. Nikkei Asian Review. 5 November 2015 [20 September 2017]. (原始内容存档于21 November 2017).
- ^ 高鐵旅運12/17突破2億人次 新竹—台北定期票旅客幸運獲獎 (in Chinese). THSRC website (新闻稿). 18 December 2012 [14 March 2013].
- ^ Taiwan high-speed rail ridership breaks 400 million mark – Focus Taiwan. focustaiwan.tw. [10 July 2021]. (原始内容存档于9 February 2021).
- ^ press release, Bureau of High Speed Rail. 針對媒體報導,就高鐵新增三站及高鐵折舊問題,高鐵局說明澄清(in Chinese). MOTC, Taiwan. 18 November 2011 [7 May 2013]. (原始内容存档于27 June 2013).
- ^ 8.0 8.1 8.2 8.3 8.4 Smith, Glenn. Into the black — how Taiwan turned around its troubled high-speed line. International Railway Journal. October 2011 [1 October 2011]. (原始内容存档于28 November 2016). 参数
|magazine=
与模板{{cite news}}
不匹配(建议改用{{cite magazine}}
或|newspaper=
) (帮助) - ^ Zhao, Eric. LPC-Taiwan's High Speed Rail Corp's lenders agree restructuring plan. Reuters. 5 August 2015 [20 September 2017]. (原始内容存档于20 September 2017).
- ^ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 台湾高速鉄道プロジェクト/日本連合受注経緯. Nippon Export and Investment Insurance. May 2003 [11 February 2011]. (原始内容存档于29 April 2008) (日语).
- ^ 11.0 11.1 Albalate, Daniel; Bel, Germa. Other Experiences. The Economics and Politics of High-Speed Rail : Lessons from Experiences Abroad. Lexington Books. 14 June 2012: 113–133. ISBN 9780739171240 –通过ProQuest Ebook Central.
- ^ 12.0 12.1 Bradsher, Keith. Taiwan's Bullet Trains Can't Outrun Controversy. The New York Times. 4 January 2007 [24 April 2008]. (原始内容存档于21 November 2020).
- ^ 13.0 13.1 13.2 13.3 13.4 13.5 13.6 Shima, Takashi. Taiwan High Speed Rail (PDF). Japan Railway & Transport Review. August 2007, (48): 40–46 [13 January 2011]. (原始内容 (PDF)存档于13 June 2011).
- ^ 14.0 14.1 1997—THE YEAR THAT WAS—1997. Taiwan Journal. 3 October 1997 [9 October 2010].[永久失效链接]
- ^ Stock Information. THSRC. [6 October 2010]. (原始内容存档于8 May 2009).
- ^ Yu, Peter Kien-hong; Jokull Johannesson. Near-bankruptcy of the Taiwan High Speed Rail Corporation: What Went Wrong?. International Journal of Business and Management. Canadian Center of Science and Education. December 2010 [10 March 2014]. (原始内容存档于13 March 2015).
- ^ Chang, Violet. Genesis of the HSR. Taiwan Today. 1 October 1998 [10 March 2014]. (原始内容存档于11 March 2014).
- ^ Taiwan HSR deal signed. Railway Gazette International (Sutton, Surrey, UK). September 1998 [9 October 2010]. (原始内容存档于15 June 2011). 参数
|magazine=
与模板{{cite news}}
不匹配(建议改用{{cite magazine}}
或|newspaper=
) (帮助) - ^ Rays of hope for Shinkansen bullet train in Taiwan?. Kyodo News International (The Free Library). 3 June 1999 [11 December 2015]. (原始内容存档于4 August 2018).
- ^ Eurotrain Consortium v. Taiwan High Speed Rail Corporation. Analysis Group. [29 September 2010]. (原始内容存档于7 July 2011).
- ^ Taiwan High Speed Rail to compensate railway consortium. Taipei Times. 27 November 2004 [28 January 2009]. (原始内容存档于11 May 2009).
- ^ Su, Joy. High-speed rail on track. Taipei Times. 2004-05-05 [2023-03-18]. (原始内容存档于18 March 2023).
- ^ Ho, Jessie. THSRC says high-speed rail runs late. Taipei Times. 2005-09-07 [2023-03-18]. (原始内容存档于18 March 2023).
- ^ 24.0 24.1 Ho, Jessie. Bullet trains arrive in Kaohsiung. Taipei Times. 2004-05-26 [2023-03-18]. (原始内容存档于18 March 2023).
- ^ High-speed rail set to begin speed tests next week. Taipei Times. 2005-08-19 [2023-03-18]. (原始内容存档于18 March 2023).
- ^ Ho, Jessie. Premier backs bullet train project during test ride. Taipei Times. 2005-11-07 [2023-03-18]. (原始内容存档于7 October 2012).
The Taiwan High-Speed Rail Corp (THSRC), builder of the high-speed rail system, reached its target of running the bullet train at a top speed of 315kph on Oct. 30.
- ^ Bradsher, Keith. Taiwan's Bullet Trains Can't Outrun Controversy. The New York Times. 2007-01-04 [2023-03-18]. ISSN 0362-4331. (原始内容存档于21 November 2020) (美国英语).
- ^ First passengers ride Taiwan high speed line. Railway Gazette International. 1 February 2007 [2023-03-18]. (原始内容存档于4 February 2023) (英语).
- ^ Ho, Jessie; Lin, Jackie. High speed rail commences operations. Taipei Times. 2007-01-06 [2023-03-18]. (原始内容存档于20 August 2020).
- ^ Jackson, Chris. Taiwan's high speed line takes off. Railway Gazette International. 29 November 2007 [2023-03-18]. (原始内容存档于7 December 2022) (英语).
- ^ Railway Bureau, MOTC. Railway Construction- HSR Planning- Taiwan High Speed Rail(HSR) Project. Railway Bureau, MOTC. 2019-09-11 [2023-03-18]. (原始内容存档于26 October 2020).
- ^ Taiwan's Pingtung high-speed rail line .... Taiwan News. 27 September 2019 [27 September 2019]. (原始内容存档于7 August 2020).
- ^ DeAeth, Duncan. MOTC criticized by Taiwan public over THSR extension plan. Taiwan News. 30 September 2019 [1 October 2019]. (原始内容存档于1 October 2019).
- ^ Strong, Matthew. Taiwan approves route for high-speed rail extension from Kaohsiung to Pingtung. Taiwan News. 2023-01-04 [2023-03-18]. (原始内容存档于18 March 2023).
- ^ Cuenca, Oliver. Tendering for Taiwan high-speed extension to begin in April. International Railway Journal. 2021-01-13 [2023-03-18]. (原始内容存档于26 April 2024) (英国英语).
the line currently scheduled to open in 2029.
- ^ Altered HSR extension plan to require new environmental assessment - Focus Taiwan. Focus Taiwan - CNA English News. 28 December 2024 [29 December 2024].
- ^ High speed services arrive at Nangang station. Railway Gazette International. 1 July 2016 [2023-03-18]. (原始内容存档于26 April 2024) (英语).
- ^ Taiwan High Speed Rail extension to Yilan cou.... Taiwan News. 23 October 2019 [24 October 2019]. (原始内容存档于30 October 2020).
- ^ Taipei-Yilan high-speed line finalized – Taipei Times. taipeitimes.com. 15 October 2020 [5 April 2021]. (原始内容存档于21 December 2021).
- ^ Cuenca, Oliver. Tendering for Taiwan high-speed extension to begin in April. International Railway Journal. 2021-01-13 [2023-03-18]. (原始内容存档于26 April 2024) (英国英语).
a 56.4km northern extension of the high-speed line between Taipei’s Nangang station and the northeastern coastal city of Yilan in October 2020. The line will include 11.4km of tunnels, and is expected to open to passengers by 2030.
- ^ 41.0 41.1 41.2 Take a Ride on the Taiwan High Speed Rail (PDF). Scope (Kawasaki Heavy Industries). January 2007 [28 November 2010]. (原始内容 (PDF)存档于29 December 2009).
- ^ THSRC to increase runs, buy more new cars: Ou Chin-der. Taipei Times. 22 November 2008 [17 January 2009]. (原始内容存档于20 August 2020).
- ^ 世昌, 陈. THSRC Chairman Ou Chin-der signed a new contract with Kawasaki for four new trainsets. 歐晉德與川崎重工簽約購高鐵四車組(in Chinese). Union Daily, 联合新闻网. 25 May 2012 [25 May 2012]. (原始内容存档于28 May 2012).
- ^ The first THSR new trainset on board at Dec.23台灣高鐵新購列車 第一組23日抵台(in Chinese). THSRC website (新闻稿). 23 December 2012 [23 December 2012].
- ^ 台灣高鐵第34組列車今(12)日運抵台灣 高安全、高運能、高準點 提升旅運服務. Taiwan High Speed Rail. 12 August 2015 [14 December 2015]. (原始内容存档于20 November 2015).
- ^ 46.0 46.1 46.2 46.3 Ishizuka, Masashi. Shinkansen Technology Exportation (PDF). 6th World Congress On high Speed Rail. UIC. 18 March 2008 [28 November 2010]. (原始内容 (PDF)存档于7 October 2011).
- ^ Company Overview. THSRC. [6 October 2010]. (原始内容存档于24 November 2009).
- ^ Tamaki, Taku. Railways as Japanese identity: Riding between confidence and inexperience. Contemporary Japan. 2023-05-29: 1–20. ISSN 1869-2729. doi:10.1080/18692729.2023.2218015
(英语).
- ^ 49.0 49.1 49.2 49.3 Taiwan High-Speed Rail Line Network. www.railway-technology.com. Net Resources International. [3 October 2010]. (原始内容存档于21 December 2021).
- ^ 50.0 50.1 700T Profile 高鐵列車. THSRC, WingMax International. [28 November 2010]. (原始内容存档于5 May 2011).
- ^ 51.0 51.1 Morgan, Scott. HSR to add 12 new trains to fleet at cost of $NT30 billion. Taiwan News. 2018-06-18 [2023-03-18]. (原始内容存档于18 March 2023).
- ^ Ryugen, Hideaki. Taiwan to buy bullet trains from Hitachi-Toshiba duo in $930m deal. Nikkei Asia. 16 March 2023 [2023-03-18]. (原始内容存档于18 March 2023) (英国英语).
- ^ 53.0 53.1 Taiwan concludes $1bn Shinkansen deal after four years of haggling. Global Construction Review. 2023-03-17 [2023-03-18]. (原始内容存档于18 March 2023) (英国英语).
- ^ Strong, Matthew. Taiwan High Speed Rail Corp. turns away from Japanese train suppliers. Taiwan News. 2022-03-05 [2023-03-18]. (原始内容存档于18 March 2023).
- ^ Thomson, Jono. Taiwan sticks with Japanese high-speed trains, confirms NT$28 billion purchase. Taiwan News. 2023-03-18 [2023-03-18]. (原始内容存档于22 April 2023).
- ^ 苏, 昭旭. 台灣鐵路火車百科:台鐵·高鐵·捷運 第三版. Taiwan: 人人出版. 2014. ISBN 9789865903404.
- ^ Jackie, Lin. High speed rail commences operations. Taipei Times. 26 January 2007 [28 September 2010]. (原始内容存档于20 August 2020).
- ^ 鸿儒, 曾. THSRC agreed pay US$65 million to Euortrain 高鐵特許年限 可能延長 (in Chinese), in the last paragraphs of this article writer mention: THSRC announced all the train drivers and controllers is finish the localization, and training to the first female chief controaller(高鐵宣佈,駕駛、行控中心已全由本土人力接手,還出現全球首位女性主任控制員;). The Liberty Times, 自由时报. 6 June 2012 [6 June 2012]. (原始内容存档于6 June 2012).
- ^ 59.0 59.1 瑄愍, 朱. Special Report of THSR OCC 高鐵行控中心分秒不打烊(in Chinese). TSSNEWS(台湾新生报). 13 June 2012 [13 June 2012]. (原始内容存档于24 February 2021).
- ^ 60.0 60.1 Taiwan High Speed Rail Earthquake Warning System (PDF). The Taiwan-Japan Workshop on the Earthquake Early Warning System (abstract). NCDR. 4 September 2007 [4 October 2010]. (原始内容 (PDF)存档于10 November 2011).
- ^ 61.0 61.1 website, THSRC. 乘車指南>安全須知>鐵路安全(in Chinese). [10 April 2013]. (原始内容存档于9 August 2011).
- ^ High-speed rail company to release new cash plan. Taipei Times. CNA. 2 November 2005 [3 October 2010]. (原始内容存档于21 December 2021).
- ^ 63.0 63.1 Officials insist high-speed rail safe despite subsidence. Taipei Times. 3 April 2010 [26 September 2010]. (原始内容存档于11 June 2010).
- ^ Peter Lin Sun, Chun-Chou Yang and Tai-Wai Lin. How to amend land subsidence treatment policies to solve coastal subsidence problems in Taiwan. Regional Environmental Change (Springer Berlin / Heidelberg). 23 December 2010, 11 (3): 679–691. ISSN 1436-3798. S2CID 154389683. doi:10.1007/s10113-010-0199-0.
- ^ Government to act on high-speed rail subsidence problem. Taipei Times. 26 July 2011 [25 July 2011]. (原始内容存档于8 August 2020).
- ^ 66.0 66.1 THSRC, Website. THSRC Ticketing Service Timetable & Fear Search (PDF). 21 May 2018 [26 June 2018]. (原始内容存档 (PDF)于18 June 2018).
- ^ 67.0 67.1 67.2 67.3 67.4 67.5 Passenger Guide. THSRC. [22 December 2013]. (原始内容存档于14 December 2013).
- ^ COMPUTEX: High-speed rail to offer 4G WiMAX service in August. Focus Taiwan News Channel. 5 June 2012 [10 June 2012]. (原始内容存档于17 February 2015).
- ^ Yueh-lin, Ma. HSR: The New Benchmark for Travel Culture. CommonWealth Magazine, 天下杂志. 19 July 2012 [8 May 2013]. (原始内容存档于17 February 2015). 参数
|magazine=
与模板{{cite news}}
不匹配(建议改用{{cite magazine}}
或|newspaper=
) (帮助) - ^ Shalun Branch line cuts travel time for Tainan commuters. Taipei Times. 3 January 2011 [2 January 2011]. (原始内容存档于28 June 2011).
- ^ New rails to link high speed and TRA trains. The China Post (Taipei). 3 March 2010 [8 October 2010]. (原始内容存档于28 August 2010).
- ^ 高鐵車站簡介. 高铁局. [13 February 2017]. (原始内容存档于3 January 2007) (中文).
- ^ TRA WebSite – tw. 交通部台湾铁路管理局. 11 December 2008 [13 February 2017]. (原始内容存档于29 August 2018).
- ^ 高鐵對台灣經濟發展的影響 (PDF). THSRC. 2009 [8 December 2010]. (原始内容 (PDF)存档于3 July 2011) (中文).
- ^ 優質服務. THSRC. [6 October 2010]. (原始内容存档于25 April 2009) (中文).
- ^ Taiwan High Speed Rail Ticketing Information. 22 December 2013 [22 December 2013]. (原始内容存档于16 December 2013).
- ^ 高鐵優惠大放送 回數票85折 定期票48折 增班改點拚營收 自由座車廂增加天天服務 (新闻稿). THSRC. 1 June 2010 [30 June 2010] (中文).
- ^ 11月起高鐵早鳥優惠新增8折優惠 8天前預購有機會享65折. THSRC. [3 October 2012] (中文).
- ^ THSR timetable. Railway Bureau. [15 February 2019]. (原始内容存档于15 February 2019).
- ^ HSR passenger volume hits record new high. The China Post (Taipei). CNA. 8 April 2008 [24 April 2008]. (原始内容存档于18 June 2008).
- ^ Lee I-chia. Rail passes assessment to add more trips. Taipei Times. 30 June 2011 [18 July 2011]. (原始内容存档于2 April 2015).
- ^ Cheng, Jessie. High-speed rail bidders confident. 5 September 1997 [11 October 2010].
|journal=
被忽略 (帮助)[永久失效链接] - ^ Li, Francis. High-speed rail to give birth to new towns. 23 July 2004 [11 October 2010].
|journal=
被忽略 (帮助)[永久失效链接] - ^ 84.0 84.1 Ten millionth passenger takes ride on bullet train. Taipei Times. 27 September 2007 [6 September 2008]. (原始内容存档于12 October 2008).
- ^ 85.0 85.1 台灣高鐵通車兩年 旅運人次倍數成長 (新闻稿). THSRC. 10 January 2009 [28 September 2010] (中文).
- ^ Record ridership for Taiwan High Speed Rail. Focus Taiwan. CNA. 3 January 2011 [3 January 2010]. (原始内容存档于27 January 2011).
- ^ High-speed rail ridership hits monthly record in July. Focus Taiwan. CNA. 1 August 2011 [2 August 2011]. (原始内容存档于15 August 2012).
- ^ 高鐵公司今日召開99年股東常會,通過98年度營業報告書、財務報表及盈虧撥補承認案,並修訂公司章程及相關作業程序 (新闻稿). THSRC. 23 June 2010 [26 July 2010] (中文).
- ^ 營運年度概況. THSRC. [26 February 2011]. (原始内容存档于16 February 2011) (中文).
- ^ thsrc. 台灣高鐵 Taiwan High Speed Rail. corp.thsrc.com.tw. [2024-07-26] (中文(台湾)).
- ^ 高鐵歡慶旅運破億 公布票號急尋獲獎旅客 (新闻稿). THSRC. 4 August 2010 [22 August 2010] (中文).
- ^ 92.0 92.1 Train ridership in Taiwan hits new high during New Year holiday. focustaiwan.tw. [6 January 2013]. (原始内容存档于11 December 2015).
- ^ 93.0 93.1 Chen, Melody. Romance of rail jeopardizes domestic air routes. 4 September 2008 [11 October 2010]. (原始内容存档于25 September 2008).
|journal=
被忽略 (帮助) - ^ Table 6-10 Passenger Load Factor of Domestic Flight by Line of Aviation. Monthly Statistics of Transportation & Communications]. MOTC Department of Statistics. [28 February 2009]. (原始内容存档于30 May 2011).
- ^ Table 6-1 Traffic Status of National Airlines. Monthly Statistics of Transportation & Communications]. MOTC Department of Statistics. [30 November 2009]. (原始内容存档于30 May 2011).
- ^ Last Taipei-Kaohsiung air service to be discontinued. Focus Taiwan News Channel. 25 June 2012 [26 June 2012]. (原始内容存档于30 June 2012).
- ^ Cheng, Yung-Hsiang. High-speed rail in Taiwan: New experience and issues for future development. Transport Policy (Elsevier). 2010, 17 (2): 51–63. doi:10.1016/j.tranpol.2009.10.009.
- ^ Taiwan's High-speed Rail: It's Been a Rapid Learning Curve. China Knowledge@Wharton (Wharton School of the University of Pennsylvania). 26 September 2007 [11 October 2010]. (原始内容存档于16 July 2011).
- ^ Chen, Melody. Fast train success deepens bus sector's woes. 4 September 2008 [11 October 2010]. (原始内容存档于25 September 2008).
|journal=
被忽略 (帮助) - ^ 100.0 100.1 HSR system sets several world records. The China Post (Taipei). 5 January 2007 [4 October 2010]. (原始内容存档于4 September 2008).
- ^ 101.0 101.1 101.2 101.3 93年年報 (PDF). THSRC. 2004 [11 February 2011]. (原始内容存档 (PDF)于23 July 2011) (中文).
- ^ 102.0 102.1 102.2 102.3 102.4 102.5 102.6 102.7 2011 Annual Report (PDF). THSRC. 2011 [22 April 2013]. (原始内容存档 (PDF)于4 April 2013).
- ^ Taiwan High Speed Rail won engineering award. The China Post. 3 August 2010 [22 November 2012]. (原始内容存档于2 April 2015).
- ^ HSR Tops List of Taiwan's 100 Best Infrastructure Projects. KMT. 15 February 2011 [12 January 2013]. (原始内容存档于8 November 2014).
- ^ 105.0 105.1 105.2 105.3 105.4 Saleem, Amair. Taiwan's High Speed Rail: Technical Challenges. PB Network (Parsons Brinckerhoff). May 2006, XXI (63) [6 October 2010]. (原始内容存档于15 July 2011).
- ^ 106.0 106.1 106.2 Briginshaw, David. Taiwan High-Speed Line On Course To Open In 2005 – High Speed: Far East. Falmouth, Cornwall, UK. October 2002 [9 October 2010]. (原始内容存档于17 October 2015).
|journal=
被忽略 (帮助) - ^ 107.0 107.1 107.2 BizTrend: Taiwan bullet train project not on right track.. Kyodo News via The Free Library. 22 December 2004 [4 October 2010]. (原始内容存档于5 February 2021).
- ^ Projects and outlook. Rail.One. [29 December 2008]. (原始内容存档于19 July 2011).
- ^ Business briefs/Rail laying begins today. Taipei Times. 17 July 2003 [3 October 2010]. (原始内容存档于21 December 2021).
- ^ RTI Radio Taiwan International. Radio Taiwan International. 25 July 2011.[失效链接]
- ^ 111.0 111.1 111.2 Taiwan's high-speed rail link cruises home. Converting Today (Sidcup, London, UK). October 2004 [30 September 2010]. (原始内容存档于28 July 2011). 参数
|magazine=
与模板{{cite news}}
不匹配(建议改用{{cite magazine}}
或|newspaper=
) (帮助) - ^ Huang, Joyce. High-speed rail installs the first giant boxgirder. Taipei Times. 16 October 2001 [3 October 2010]. (原始内容存档于7 October 2012).
- ^ 20 Longest Bridges in the world. World Atlas. [6 February 2017]. (原始内容存档于21 December 2021).
- ^ Seismic Resistant Viaduct Design for the Taiwan High Speed Rail Project. LUSAS. [28 February 2011]. (原始内容存档于21 November 2010).
- ^ Martin, Empelmann; Whittaker, David; Los, Eimert; Dorgarten, Hans-Wilhelm. Taiwan High Speed Rail Project – Seismic Design of Bridges Across the Tuntzuchiao Active Fault (PDF). Proceedings of the 13th World Conference on Earthquake Engineering (Indian Institute of Technology Kanpur). 2004 [28 February 2011]. (原始内容 (PDF)存档于10 November 2011).
- ^ THSRC starts major work this month. Railway Gazette International (Sutton, Surrey, UK). March 2001 [9 October 2010]. (原始内容存档于15 June 2011). 参数
|magazine=
与模板{{cite news}}
不匹配(建议改用{{cite magazine}}
或|newspaper=
) (帮助) - ^ World Digest of Ongoing Tunnelling: Taiwan (PDF). E-News Weekly (Tunnelbuilder). 10 October 2002: 2–4 [9 October 2010]. (原始内容 (PDF)存档于17 November 2003).
- ^ Lin, Pao H.; Tserng, H. P.; Lin, Ching C. Automated construction of the Paghuashan tunnel for Taiwan High Speed Rail (THSR) project (PDF). Automation in Construction. 2006, 15 (5): 627–639 [4 October 2010]. doi:10.1016/j.autcon.2005.08.002. (原始内容 (PDF)存档于23 July 2011).
- ^ Ho, Jessie. Despite delays, high-speed rail begins test runs. Taipei Times. 28 January 2005 [3 October 2010]. (原始内容存档于20 August 2020).
- ^ Taiwan Quick Take/Train tests to 300kph. Taipei Times. 30 October 2005 [3 October 2010]. (原始内容存档于21 December 2021).
- ^ Ho, Jessie. Premier backs bullet train project during test ride. Taipei Times. 7 November 2005 [3 October 2010]. (原始内容存档于5 February 2021).
- ^ Ho, Jessie. High speed rail commences operations. Taipei Times. 6 January 2007 [28 September 2010]. (原始内容存档于20 August 2020).
- ^ Taiwan Quick Take/Taipei HSR station opens. Taipei Times. 2 March 2007 [28 September 2010]. (原始内容存档于21 December 2021).
- ^ Joyce M.W., Low; Lee, Byung Kwon. A Data-Driven Analysis on the Impact of High-Speed Rails on Land Prices in Taiwan. Applied Sciences. 12 May 2020, 10 (10): 3357. doi:10.3390/app10103357
.
- ^ 游智文. 全台15重劃區房價飆 最狂前三名都在新竹. United Daily News. 29 September 2021 [28 December 2021]. (原始内容存档于13 October 2021) (中文(台湾)).
- ^ Lee, Derek. Progress without ruffled feathers. Taipei Times. 31 March 2002 [3 October 2010]. (原始内容存档于7 October 2012).
- ^ 水雉生態教育園區. [13 June 2012]. (原始内容存档于30 May 2013).
- ^ 128.0 128.1 Yahoo 搶救金山面老樹及伯公廟. [13 June 2012]. (原始内容存档于7 August 2020) (中文).
- ^ 筱慧, 车. 搶救金山面老樟樹,各方集思廣益(in Chinese). The Liberty Times, 自由时报. 15 March 2008 [13 June 2013]. (原始内容存档于19 April 2013).
- ^ 2007 Financial Report (PDF). THSRC. [10 May 2014]. (原始内容 (PDF)存档于25 December 2014).
- ^ 2008 Financial Report (PDF). THSRC. [10 May 2014]. (原始内容 (PDF)存档于25 December 2014).
- ^ 132.0 132.1 2009 Financial Report (PDF). THSRC. [10 May 2014]. (原始内容 (PDF)存档于14 May 2014).
- ^ 133.0 133.1 2010 Financial Report (PDF). THSRC. [14 February 2012]. (原始内容存档 (PDF)于20 September 2011) (中文).
- ^ 2011 Financial Report (PDF). THSRC. [10 May 2014]. (原始内容 (PDF)存档于25 December 2014).
- ^ 2012 Financial Report (PDF). THSRC. [10 May 2014]. (原始内容 (PDF)存档于25 December 2014).
- ^ Taiwan High Speed Rail 2013 Annual Report (PDF). [28 November 2015]. (原始内容 (PDF)存档于7 March 2016).
- ^ 137.0 137.1 137.2 2017 Annual Report (PDF). THSRC. [2 February 2018]. (原始内容存档 (PDF)于23 August 2017).
- ^ Taiwan High Speed Rail Annual Report 2017 (PDF). Taiwan High Speed Rail. 2018 [1 September 2018]. (原始内容存档 (PDF)于16 August 2021).
- ^ Taiwan High Speed Rail Corporation 2018 Annual Report (PDF). Taiwan High Speed Rail Corporation. 2019 [20 May 2020]. (原始内容存档 (PDF)于9 December 2021).
- ^ 静贤, 贺. 菜菜子3天操40小時 高鐵每天租金百萬? (in Chinese). The Liberty Times, 自由时报. 25 September 2012 [24 April 2013]. (原始内容存档于28 October 2012).
- ^ Lin, Judy. THSRC aims to double revenues. Taipei Times. 18 January 2008 [6 September 2008]. (原始内容存档于14 October 2008).
- ^ THSRC runs in red during first 2 months of operations. The China Post (Taipei). 13 March 2007 [19 September 2010]. (原始内容存档于23 September 2012).
- ^ 143.0 143.1 Shen, Ben. High-Speed Rail in Taiwan Finally Breaks Even in April. Taiwan Economic News. 29 May 2008 [24 February 2009]. (原始内容存档于20 February 2011).
- ^ THSRC April revenue exceeds NT$1 bil.. The China Post (Taipei). CNA. 11 May 2007 [19 September 2010]. (原始内容存档于23 September 2012).
- ^ 145.0 145.1 145.2 145.3 Official hints at extending THSRC handover period. Taipei Times. 15 October 2009 [30 November 2009]. (原始内容存档于7 August 2020).
- ^ 146.0 146.1 High Speed Rail system not suitable for gov't takeover: Ing. The China Post (Taipei). 4 June 2009 [30 November 2009]. (原始内容存档于10 September 2012).
- ^ 147.0 147.1 Hsu, Crystal. High Speed Rail narrows losses on lower overheads. Taipei Times. 2 September 2009 [19 September 2010]. (原始内容存档于6 September 2009).
- ^ 148.0 148.1 148.2 THSRC generates first net operating profit in 2009. Focus Taiwan. CNA. 23 June 2010 [19 September 2010]. (原始内容存档于3 March 2012).
- ^ High speed rail operator sees first ever profit after five years. The China Post. 31 March 2012 [2 April 2012]. (原始内容存档于17 October 2015).
- ^ 150.0 150.1 Ministry defends THSRC's earnings record, potential. Taipei Times. 25 September 2009 [30 November 2009]. (原始内容存档于28 September 2009).
- ^ 151.0 151.1 Liu, Philip. THSRC's accumulated red ink equals half its capital. Taiwan Economic News. 29 August 2008 [19 September 2010]. (原始内容存档于20 May 2011).
- ^ Liu, Philip. THSRC Requests Banking Consortium to Cut Interest Rate. Taiwan Economic News. 2 September 2008 [24 February 2009]. (原始内容存档于24 July 2011).
- ^ 針對媒體有關高鐵融資結構之說法,高鐵強調依風險降低之事實重新檢視規劃融資安排,屬BOT計畫正常作業,絕非所謂紓困特惠。 (新闻稿). THSRC. 10 February 2009 [28 September 2010] (中文).
- ^ Taiwan High-Speed Rail seeking favorable loan terms. The China Post (Taipei). 7 February 2009 [24 February 2009]. (原始内容存档于19 March 2012).
- ^ Taiwan high speed rail refinancing agreed. Railway Gazette International (Sutton, Surrey, UK). 13 August 2009 [30 November 2009]. (原始内容存档于19 September 2012). 参数
|magazine=
与模板{{cite news}}
不匹配(建议改用{{cite magazine}}
或|newspaper=
) (帮助) - ^ Crystal, Hsu. Ou Chin-der replaces Ing at THSRC. Taipei Times. 23 September 2009 [30 November 2009]. (原始内容存档于3 October 2012).
- ^ Joyce, Huang. Government takes charge at THSRC. Taipei Times. 11 November 2009 [30 November 2009]. (原始内容存档于16 November 2009).
- ^ Liu, Philip. THSRC Signs NT$380 B. Refinancing Contract. Taiwan Economic News. 11 January 2010 [22 August 2010]. (原始内容存档于29 August 2010).
- ^ Suspicious items lead to evacuation of bullet train. taipeitimes.com. 13 April 2013 [13 April 2013]. (原始内容存档于10 February 2021).
- ^ Explosives found on High Speed Rail train - the China Post. [13 April 2013]. (原始内容存档于15 April 2013).
- ^ Chen, Wei-ting; Wu, Lilian. High speed train runs on wrong track, first time ever. Focus Taiwan. 13 May 2017 [17 May 2017]. (原始内容存档于16 May 2017).
- ^ Everington, Keoni. Masks mandatory on Taiwan trains, intercity buses starting today. Taiwan News. April 2020 [4 April 2020]. (原始内容存档于9 October 2021).
- ^ Taiwan's THSR to cancel non-reserved seats first week of April as virus precaution. Taiwan News. 3 March 2020 [4 April 2020]. (原始内容存档于5 March 2020).
- ^ 夏天的尾巴 緊抓高鐵譜青春. Liberty Times (Taipei). 8 May 2007 [8 December 2010]. (原始内容存档于9 December 2007) (中文).
- ^ Tan, Jason. Sony announces first Taiwanese game for popular PS3 console. Taipei Times. 20 April 2007 [8 December 2010]. (原始内容存档于27 September 2020).
- ^ National Geographic, Travel. Best Winter Trip 2013/ Western Taiwan by (High Speed) Train. National Geographic. 16 November 2012 [9 May 2013]. (原始内容存档于21 December 2021). 参数
|magazine=
与模板{{cite news}}
不匹配(建议改用{{cite magazine}}
或|newspaper=
) (帮助)
Further reading
[编辑]- Hood, Christopher P. Shinkansen – From Bullet Train to Symbol of Modern Japan. London: Routledge. 2006. ISBN 0-415-44409-8.
External links
[编辑]
- 官方网站 (英语)
- Bureau of High Speed Rail, Ministry of Transportation and Communications 互联网档案馆的存档,存档日期23 November 2015.
Template:Taiwan High Speed Rail Template:Taiwan Rail Transport Template:High-speed rail Template:High-speed railway lines Template:FTSE TWSE Taiwan 50Template:Transport in Taiwan
- Pages with incorrect use of RailGauge template
- Taiwan High Speed Rail
- Rail transport in Taiwan
- Rail transportation in Taipei
- Rail transportation in Tainan
- Rail transportation in Kaohsiung
- Build–operate–transfer
- High-speed rail in Taiwan
- High-speed trains
- Railway lines opened in 2007
- 2007 establishments in Taiwan
- 25 kV AC railway electrification
- Companies based in Taipei